NAME OF CLIENT: TUPRAS Turkey Petroleum Refinery Inc.
CONTRACT YEAR: 2023
LOCATION: Kırıkkale
Within the scope of the project, it is planned to achieve water production at raw water quality along with the ASA recovery unit, which has a discharge amount of 70 m3/h. The recovered water at raw water quality is intended to be used as raw water in the demineralization (water softening) unit and cooling tower. The project is designed to include mechanical filtration/CFS, activated carbon filtration, ultrafiltration system, and reverse osmosis.
Basic Engineering Document Preparation:
.
NAME OF CLIENT: TUPRAS Turkey Petroleum Refinery Inc.
CONTRACT YEAR: 2023
LOCATION: Batman
Within the scope of the project, it is planned to achieve water production at raw water quality along with the ASA recovery unit, which has a discharge amount of 70 m3/h. The recovered water at raw water quality is intended to be used as raw water in the demineralization (water softening) unit and cooling tower. The project is designed to include mechanical filtration/CFS, activated carbon filtration, ultrafiltration system, and reverse osmosis.
Basic Engineering Document Preparation:
.
NAME OF CLIENT: Mega Endüstri Kontrol Sistemleri Ticaret Limited Şirketi
CONTRACT YEAR: 2022
LOCATION: Karbala/Iraq
Automated liquid HFO Road Tanker Loading Facility includes lines from 34000 m3 HFO tanks to truck loading station with pumps and necessary drums and equipment.
Promer scope is basic and detail engineering.
.
NAME OF CLIENT: Oksut Mining Industry and Trade Inc.
CONTRACT YEAR: 2022
LOCATION: Kayseri/Turkey
The CLIENT has an investment in 1.000 m3/day WTP in the facility. Treated water is planned to be used in dust suppression and/or as process water. Treated water is collected from two WRDs which are lower than the level of planned WTP and two ponds which is the storage of residual materials from the crusher unit. These two ponds in the storage of residuals are called as LG and MGHG. LG and MGHG’s levels are higher than the planned WTP. A storage pond with a capacity of 5,000 tons and a filling station is planned to store and load treated water for dust supression. Excess treated water is discharged to Manbol River via a pipeline which is an item of this project as well.
Basic and Detail Engineering:
NAME OF CLIENT: TUPRAS Turkey Petroleum Refinery Inc.
CONTRACT YEAR: 2020
LOCATION: Kırıkkale/ Turkey
Basic and Detailed engineering services were provided for the establishment of a new SWS unit within the TÜPRAŞ Kırıkkale Refinery. When the project is completed, the unit will have the capacity to decompose 65 m3 of dirty water per hour.
NAME OF CLIENT: Oyak Energy Likitgaz Dağıtım ve Endüstri A.Ş.
CONTRACT YEAR: 2020
LOCATION: Hatay/Turkey
After laser scanning has been made to attain the 3-D modelling of the plant, performance check of existing plant, has been performed.
NAME OF CLIENT: Oyak Energy Likitgaz Dağıtım ve Endüstri A.Ş.
CONTRACT YEAR: 2020
LOCATION: İzmir/Turkey
After laser scanning has been made to attain the 3-D modelling of the plant, performance check of existing plant, has been performed.
NAME OF CLIENT: Turkish Petroleum Corporation
CONTRACT YEAR: 2020
LOCATION: Batman/Turkey
The project consists of design of petroleum plant which processes and stocks the crude oil attained at the Cakilli Site with a capacity of 5000 bbl oil and 10000 bbl water.
The plant consists of design of stock tanks, overflow tanks, emulsion breaker, free water separation systems, manifold system, pump system, closed wastewater injection system, fire protection system, automation system with underground pipeline for production wells and 3 pieces of site manifold systems according to current local and international codes.
NAME OF CLIENT: TUPRAS Turkey Petroleum Refinery Inc.
CONTRACT YEAR: 2020
LOCATION: Aliaga/Izmir/Turkey
When the oily water flow rate is above the current capacities of wastewater treatment plants (ASA1 / ASA2) during periods of heavy rainfall, oily water overflows from the pools to the sea. In order to prevent this, it includes the construction of stock tanks in accordance with API650 with a capacity of 2x17.000 m³ and the piping works required to transfer wastewater, scraped wet and sludge between the tanks to be newly built in ASA1 / ASA2 fields.
Detail Engineering:
Plan the infrastructure required to support the new tanks and piping systems, including foundations, access roads, and drainage systems.
NAME OF CLIENT: TUPRAS Turkey Petroleum Refinery Inc.
CONTRACT YEAR: 2020
LOCATION: İzmit/Kocaeli/Turkey
This project is within the boundaries of the TÜPRAŞ Izmit Refinery Zone B area, where the phenolic contaminated water coming from PLT.177 to PLT.141 will be increased effectively by increasing the rest period before reaching PLT.141 and the existing 2 pieces of 5387 m3 nominal capacity It includes the engineeringstudies of the settling tanks (together with their systems and accessories), and hydrocarbon decomposition, the phenolic waters are directed to PLT.141 in a controlled manner.
NAME OF CLIENT: TUPRAS Turkey Petroleum Refinery Inc.
CONTRACT YEAR: 2020
LOCATION: Aliaga/Izmir/Turkey
Feed, basic and detail engineering of crude oil system.
NAME OF CLIENT: TUPRAS Turkey Petroleum Refinery Inc.
CONTRACT YEAR: 2019
LOCATION: Kırıkkale/Turkey
Promer develops an engineering package for capacity increase of existing hydrocracker unit.
NAME OF CLIENT TPIC (Turkish Petroleum International Company)
CONTRACT YEAR 2018
LOCATION Ceyhan /Adana/Turkey
The plant capacity is 1 million tons. It contains 17 diesel tank with 712.000 m3 in total, 9 jet A-1 fuel with 396,500 m3 in total and 4 fuel oil tank with 121,500 m3 in total.
The scope includes a jetty, a land terminal and loading arms for loading and unloading facility, pump stations, tanks and metering stations.
All of the main and auxiliary systems are in the scope of the study.
NAME OF CLIENT TUPRAS Turkey Petroleum Refinery Inc.
CONTRACT YEAR 2017
LOCATION Aliaga/Izmir/ Turkey
An offshore platform 2 km distance from land is designed for LPG, jet fuel and diesel fuel loading with 3 loading arms for ships with capacity from 5000 GWT to 55000 GWT.
Metering station on land and connecting undersea pipes to platform are also in scope of the project.
NAME OF CLIENT Aquamatch
CONTRACT YEAR 2015-2016
LOCATION Aliaga/Izmir/ Turkey
Project’s aim is to improve the demin water system, insertion quality of raw water, provide water save and increase the ratio of ASA recovery. Other targets are to provide a safe process water source in middle and long term by increasing the contribution of sea water usage, to improve tower and demin water operations and provide energy efficiency.
Piping engineering, general layout, structural design, 3-D PDMS modelling, electrical and instrumentation, material take-off
Basic and Detail Engineering Design:
Planning and design of waste tanks, supporting infrastructure including roads, drainage and utilities.
NAME OF CLIENT: Tüpraş Türkiye Petrol Rafinerileri A.Ş.
LOCATION: İzmit/Kocaeli, TÜRKİYE
The main distribution point of the fuel gas system consumed as a fuel source in the furnaces and boilers of the TÜPRAŞ İzmit Refinery RUP field is located in the Plt 109 unit. Off-gas produced in the Plt 177 Coker and Plt 147 Hydrocracker units and natural gas taken from the grid are combined in the Plt 109 unit and distributed to the units as fuel gas. In order to replace the natural gas used in the system, it is aimed to vaporize the LPG produced in the Plt 177 and Plt 147 units and feed it into the fuel gas system. For this purpose, the vaporizer system to be established will be installed in the Plt 147 unit and will use the LPG production of the Plt 147/177 units as a source.
NAME OF CLIENT: Tüpraş Türkiye Petrol Rafinerileri A.Ş.
LOCATION: İzmit/Kocaeli, TÜRKİYE
The auxiliary services of the TÜPRAŞ İzmit Refinery RUP region are produced in the Plt-109 power plant unit. The plant has 2 gas turbines, 2 waste heat boilers, and 1 intermediate draft steam turbine. The Plt-109 unit produces steam at pressure levels of VHP (100 barg), HP (40 barg), MP (11 barg), and LP (5 barg). The produced VHP steam is fed to the 109K-250 steam turbine, and the HP and LP steam consumed in the refinery are extracted from intermediate stages to generate electricity. MP steam is produced by breaking down HP steam using a pressure control valve. The project aims to produce 80 t/h of MP steam by a newly installed steam turbine instead of breaking down HP steam, thereby generating electricity.
The services in scope is as follows:
NAME OF CLIENT: Tüpraş Türkiye Petrol Rafinerileri A.Ş.
LOCATION: İzmit/Kocaeli, TÜRKİYE
The 9E-601 tower, located in Unit Plt-9, has 5 compartments. Physically, the tower is divided into two separate sections on site: 9E-601/A,B and 9E-601/C,D,E, and these two sections are connected by pipeline from the tower pools. Since each compartment has a capacity of 1760 m3, the total capacity of the tower is 8800 m3. The pool capacity of the 9E-601 tower is 4700 m3. The tower has 3 water circulation pumps, 9GM-601A/B and 9GT-601C. The capacity of the electric motor pumps is 6160 m3/hour, and the capacity of the turbine pump is 8800 m3/hour. While turbine-type pumps can meet 100% of the cooling tower's capacity, each of the electric motor-driven pumps meets 70% of the tower's capacity. The project requests the replacement of the 9GM-601A pump with an electric-driven centrifugal pump that meets the required specifications.
Promer scope of work:
NAME OF CLIENT: Tüpraş Türkiye Petrol Rafinerileri A.Ş.
LOCATION: Aliağa/İzmir, TÜRKİYE
Basic and Detailed engineering of industrial waste treatment plant within the TÜPRAŞ Aliağa Refinery.
NAME OF CLIENT: Tüpraş Türkiye Petrol Rafinerileri A.Ş.
LICENSOR: Shell SGS
LOCATION: İzmit/Kocaeli, TÜRKİYE
The services in scope is as follows:
Basic and detailed engineering services for
NAME OF CLIENT: Tüpraş Türkiye Petrol Rafinerileri A.Ş.
LICENSOR: Axens
LOCATION: Aliağa/İzmir, TÜRKİYE
Propylene produced in the FCC Unit will pass through a trim cooler and its temperature will be reduced, it will pass through the prefilter/coalescer. The product from the coalescer will go to the molsieve unit and will be sent to the propylene tanks in the tank area. Propylene tanks can be used in both LPG and propylene service. After the propylene tanks, the product sales lines will continue under the sea until the LPG pier. The product will be sold with the filling arm, which will be newly installed on the LPG pier. The services in scope is as follows:
Feed and detail engineering services for
NAME OF CLIENT: Tüpraş Türkiye Petrol Rafinerileri A.Ş.
LOCATION: İzmit/Kocaeli, TÜRKİYE
Bitumen export is planned from Izmit refinery Phase-3 jetty. One bitumen tank, bitumen sales lines and 2 sales pumps will be installed at Izmit Refinery. The new tank 177D-501 has a net working volume of 25,000 m3. For the sale of bitumen, a new 24" export line is installed and extended to the existing jetty loading arms, also existing 24” jetty line will be used for both selling and loading of tank. New 24” line to the jetty is connected to the existing loading arms.
NAME OF CLIENT: Tüpraş Türkiye Petrol Rafinerileri A.Ş.
LICENSOR: Merichem
LOCATION: Kırıkkale, TÜRKİYE
TUPRAS and Merichem agreed for the supply of a Basic Engineering Design Package (PEP) for revamping the existing THIOLEXTM/REGEN® unit. This PEP details the design of the revamp system to add a 2nd stage THIOLEXTM vessel with FFC Plus® Contactor. TUPRAS has an existing Saturated C3/C4 LPG Treatment Unit using Merichem’s THIOLEXTM and REGEN® Technologies. PROMER scope is improvement of basic engineering and full detail engineering.
NAME OF CLIENT: Akkim A.Ş.
LICENSOR: kvt Technology
LOCATION: Yalova, TÜRKİYE
The facilities to be invested for the production of solid and liquid epoxy resins are in a way that they will work in integration with each other. In other words, the output (product) of one facility will be used as the input (raw material) of the other facility. When the investment is put into operation, 3 end products will be obtained: Liquid Epoxy Resin, Solid Epoxy Resin and Epichlorohydrin.
Promer scope of work:
NAME OF CLIENT: Sigma Mühendislik Makine San. ve Tic. A.Ş.
LOCATION: Tekirdağ, Kahramanmaraş, TÜRKİYE
Two identical starch production plants are designed in Kahramanmaraş and Tekirdağ. The capacity of both plants is 1,100 tons/day. The Piping, structural, mechanical, electrical and instrumentation detail design is carried out.
NAME OF CLIENT: Tüpraş Türkiye Petrol Rafinerileri A.Ş.
LOCATION: All Rafineries
PROMER scope is preparation of basic engineering documents for the following projects:
NAME OF CLIENT: Cargill
LOCATION: Bursa, TÜRKİYE
Basic and Detail Engineering