NAME OF CLIENT: Petrol Global Port Operations and Storage Industry and Trade Inc.
CONTRACT YEAR: 2023
LOCATION: Iskenderun/Hatay
PROJECT DESCRIPTION: CLIENT has a green field by 2 parcels where at least 6 sphere LPG tanks and other chemical and petroleum tanks are planning to be constructed as an investment of 642.000 cbm tank farm.
SERVICES:
.
NAME OF CLIENT: TUPRAS Turkey Petroleum Refinery Inc.
CONTRACT YEAR: 2023
LOCATION: Batman
PROJECT DESCRIPTION: Within the scope of the project, it is planned to achieve water production at raw water quality along with the ASA recovery unit, which has a discharge amount of 70 m3/h. The recovered water at raw water quality is intended to be used as raw water in the demineralization (water softening) unit and cooling tower. The project is designed to include mechanical filtration/CFS, activated carbon filtration, ultrafiltration system, and reverse osmosis.
SERVICES:
.
NAME OF CLIENT: TUPRAS Turkey Petroleum Refinery Inc.
CONTRACT YEAR: 2023
LOCATION: İzmit/Kocaeli
PROJECT DESCRIPTION: With this project, the aim is to transfer the rich DEA of Plt 47-300 or Plt 63-300 to the Plt 147-400 Amine Unit. At this point, it will be stripped of H2S and sent to the absorbers served by the regeneration columns. This will enable the shutdown of the Plt-48 Sulfur Recovery Unit, and in case of a potential problem, Plt 63-300 Unit can be redirected to Plt 147-400.
SERVICES:
.
NAME OF CLIENT: TUPRAS Turkey Petroleum Refinery Inc.
CONTRACT YEAR: 2023
LOCATION: İzmit/Kocaeli
PROJECT DESCRIPTION: TÜPRAŞ İzmit Refinery Plant 9 and Plant 10 units have experienced increased maintenance costs for their existing air compressors, and frequent breakdowns pose a threat to operational reliability. Due to the risk they present to the refinery's compressed air needs, Basic Engineering Services will be provided for the installation of (2) two oil-free air compressors in the Plant-9 and Plant-10 air system area. This includes determining the capacity of the compressors based on the desired electrical connections, selecting the compressor locations, assessing the feasibility of diesel connections, sizing the required piping for connection to the existing air system, controlling the capacity of existing air receiver drums, compressor control scheme equipment representations, and identifying the equipment necessary for system installation, including thermal and electrical loads, within the scope of the engineering study.
SERVICES:
.
NAME OF CLIENT: TUPRAS Turkey Petroleum Refinery Inc.
CONTRACT YEAR: 2023
LOCATION: Kırıkkale
PROJECT DESCRIPTION: Within the scope of the project, it is planned to support the production of demineralized water in the refinery and meet the demineralized water quantity required for green hydrogen production with the ASA recovery unit, whose discharge quantity is determined to be 200 m^3/s. In addition, the unit's charge can be directed to support cooling towers and the WTP unit. The project is planned to include multi-layered carbon filter, activated carbon filter, ultrafiltration system, reverse osmosis 1, reverse osmosis 2, and EDI units.
SERVICES:
.
NAME OF CLIENT: Mega Endüstri Kontrol Sistemleri Ticaret Limited Şirketi
CONTRACT YEAR: 2022
LOCATION: Karbala/Iraq
PROJECT DESCRIPTION: The project will consist of the realization, starting with basic and detail design of the Terminal with a storage unit of 8000 m³/day spread over fuel distribution facility, ancillary facilities and general facilities. (Security control building (main entrance), Stamping building, Dispatch office- building, Driver lounge building, Workshop (Mechanical, electrical & instrument), Staff service building (Baths Wcs, restaurant and other), Administration building, Substation & electrical panel (PLC, MCC, EDP) building, Infirmary building (Medical), Staff & guest entrance building.
SERVICES:
.
NAME OF CLIENT: TUPRAS Turkey Petroleum Refinery Inc.
CONTRACT YEAR: 2022
LOCATION: Izmir/Turkey
PROJECT DESCRIPTION: After the propylene current to be produced in the FCC Unit will pass through a trim cooler and its temperature will be reduced to values that will create free water, it will pass through the prefilter/coalescer and separate the free water. The product from the coalescer will go to the molsieve unit and will be sent to the propylene tanks in the tank area after the propylene stream dissolved water is separated. Propylene tanks can be used in both LPG and propylene service. After the propylene tanks, the product sales lines will pass through the new pump area and continue under the sea until the LPG pier. The product will be sold with the filling arm, which will be newly installed on the LPG pier.
SERVICES:
.
NAME OF CLIENT: TUPRAS Turkey Petroleum Refinery Inc.
CONTRACT YEAR: 2022
LOCATION: İzmit/Kocaeli
PROJECT DESCRIPTION: Bitumen export is planned at Izmit Refinery Phase 3 Jetty. In this context 3 bitumen tanks, bitumen disposal line and disposal pumps are installed at Izmit Refinery. Each tank has a capacity of 11,000 m3. From the tanks 2 pumps with a capacity of 700 m3/hr and 24''X26'' line is planned. The line is ended at C,D,E,F jetty.
SERVICES:
.
NAME OF CLIENT: TUPRAS Turkey Petroleum Refinery Inc.
CONTRACT YEAR: 2022
LOCATION: Kirikkale/ Turkey
PROJECT DESCRIPTION: TÜPRAŞ intended to revamp Plant-1700 LPG - THIOLEX unit in at Kırıkkale Refinery. In this manner, PROMER developed complete detailed feed study package for the projects in the Units. PROMER optimized the design while using/interpreting OWNER/LICENSOR specifications, national and international codes and standards and best practice of industry to the extent to maintain the current status of PROJECT caring the project economics as well as schedule constraints.
SERVICES:
.
NAME OF CLIENT: TUPRAS Turkey Petroleum Refinery Inc.
CONTRACT YEAR: 2022
LOCATION: Batman
PROJECT DESCRIPTION: In the top-loading method, the loading pipe that transfers the product is only partially lowered into the tank part of the truck, and during this process significant turbulence and vapor/liquid contact occur, resulting in a high level of steam formation and loss.
Since volatile organic compound emissions occur during loading to the tank truck in the top-loading method, it is aimed to do the loading islands of gasoline-diesel suitable for bottom-loading in order to minimize this situation and make the process safer.
SERVICES:
.
NAME OF CLIENT: TUPRAS Turkey Petroleum Refinery Inc.
CONTRACT YEAR: 2022
LOCATION: İzmir
PROJECT DESCRIPTION: TUPRAS is planning to invest in natural gas expansion unit in order to produce electricity from waste energy.
The aim of the project is to generate electricity by using the expansion of natural gas and to provide the required pre-heat by using waste heat from process units/LP steam/current RMS-B preheat system options.
SERVICES:
.
NAME OF CLIENT: TUPRAS Turkey Petroleum Refinery Inc.
CONTRACT YEAR: 2022
LOCATION: İzmit/Kocaeli
PROJECT DESCRIPTION: The production of auxiliary services in the RUP area of TÜPRAŞ Izmit Refinery is carried out in the Plt 109 power plant unit. The plant consists of 2 gas turbines, 2 waste heat boilers, and 1 intermediate pressure steam turbine. In the Plt 109 unit, steam is produced at VHP (100 barg), HP (40 barg), MP (11 barg), and LP (5 barg) pressure levels. The produced VHP steam is fed to the 109K-250 steam turbine, where HP and LP steam are withdrawn from intermediate stages and used to generate electricity in the refinery. MP steam is produced by relieving pressure from HP steam using a pressure control valve. The project aims to produce 80 t/h MP steam by installing a new steam turbine instead of breaking it from HP steam, thereby generating electricity.
SERVICES:
.
NAME OF CLIENT: TUPRAS Turkey Petroleum Refinery Inc.
CONTRACT YEAR: 2021
LOCATION: Kocaeli/Turkey
PROJECT DESCRIPTION: Tupras intends to place 2 pieces (1 major, 1 backup) of jig filter with 1000 m3/h each at phase-2 jetty and 6 pieces (3 major, 3 backup) of jig filter with 1000 m3/h each at phase-3 jetty at Izmir Refinery Area A.
Promer accomplished the detailed engineering service for the assignment.
SERVICES:
.
NAME OF CLIENT: TUPRAS Turkey Petroleum Refinery Inc.
CONTRACT YEAR: 2021
LOCATION: Kocaeli/Turkey
PROJECT DESCRIPTION: TUPRAS Izmit Refinery intends to have detail design and engineering services for the revamping during the Change of Liquid Process of 26G-209 Pump Project and its piping system.
During the assignment, detailed design for all engineering disciplines (structural, mechanical, piping, electrical and instrumentation) have been carried out. Moreover DCS and ESD systems have been modified due to the revision in the main system.
SERVICES:
.
NAME OF CLIENT: TUPRAS Turkey Petroleum Refinery Inc.
CONTRACT YEAR: 2021
LOCATION: Kocaeli/Turkey
PROJECT DESCRIPTION: The services in scope is as follows:
Detailed design services for
SERVICES:
.
NAME OF CLIENT: TUPRAS Turkey Petroleum Refinery Inc.
CONTRACT YEAR: 2021
LOCATION: Kocaeli/Turkey
PROJECT DESCRIPTION: The project consists of the revision in order to increase rhe efficiency of the plant 141. PROMER has the scope of detailed engineering services for the revision of the process and utility lines for the project.
SERVICES:
NAME OF CLIENT: Likitgaz Dağıtım ve Endüstri A.Ş.
CONTRACT YEAR: 2020
LOCATION: İzmir/Turkey
PROJECT DESCRIPTION: After laser scanning has been made to attain the 3-D modelling of the plant, design for fire protection has been performed with all aspects for Izmir Plant.
SERVICES:
NAME OF CLIENT: Likitgaz Dağıtım ve Endüstri A.Ş.
CONTRACT YEAR: 2020
LOCATION: Hatay/Turkey
PROJECT DESCRIPTION: After laser scanning has been made to attain the 3-D modelling of the plant, design for fire protection has been performed with all aspects for Dortyol Plant.
SERVICES: